IDEA-001 change register
Chronological scope and checkpoint history, separate from original inputs.
2026-10-09 — proposed follow-up scope
- Preserved original input, data-focus steering and completed RES-001 without changes or retrospective approval.
- Published scope v001: proposed partner/data-access evidence phase, with bounded comparisons and no implementation or economics work.
- Updated editable brief to planned / awaiting-user-signoff. No user approval or manager start authorization has been received.
- Prior baseline commit reported in the assignment:
ac94f25. Scope checkpoint is ready for the manager to commit; no commit is asserted here. These files freeze upon handoff until the manager confirms the checkpoint.
2026-10-09 — co-founder correction and revised scope
- Manager confirmed the frozen v001 checkpoint committed as
scope(IDEA-001): preserve proposed v001 awaiting sign-offand lifted the freeze. v001 bytes remain unchanged. - Preserved the exact user correction in dated co-founder input: “BlueBird Chuika are our co-founders.”
- Published scope v002, replacing identity-candidate research with a co-founder detector documentation inventory. This changes a deliverable materially; both gates remain pending. The correction is not scope approval.
- Updated brief to point to v002 and retain planned / awaiting-user-signoff. New checkpoint ready for the manager; files freeze again upon handoff.
2026-10-09 — supplied product link
- Manager confirmed v002 committed under
idea(IDEA-001): preserve co-founder clarification and scope v002and lifted the freeze. - Preserved user-supplied BlueBird detector link; brief now links it. Limited naming inspection only; capture staged for manager integration with extraction/HTTP limitations recorded.
- Nonmaterial clarification: optional source supplied within existing v002, with no change to deliverables, access or budget. v002 unchanged; both gates remain pending.
2026-10-09 — human approval of v002
- Recorded exact human message “Approved” in user receipt, tied to unchanged v002 SHA-256
7adc5e587000e0b99f899b53dc3f5d080200019d85734a6b563eb8857d59b2e6. - Brief moved to planned / awaiting-manager-start. Separate manager authorization and shared-evidence ownership are pending.
- Approval checkpoint ready; receipt, brief and changes register frozen for manager commit upon handoff.
2026-10-09 — manager authorizes v002
- Manager corroborated human approval in the owning chat and checked the unchanged scope hash.
- Separate manager receipt authorizes the bounded research phase and allocates the four canonical profiles and relevant source records; shared indexes/log/Git remain with manager.
- Brief moved to planned / authorized pending committed start handoff.
2026-10-09 — manager-authorized execution begins
- Manager start receipt and explicit start message expand the prior scoping assignment to v002 research. Approval/start checkpoint was committed by manager before execution.
- Brief moved to in-progress; two bounded Sol workers have separate company/source/output ownership and an 8+4 new-URL allocation. Parent owns synthesis, one independent Sol review and completion handoff.
2026-10-09 — new-source limit overrun disclosed
- Parent allocated eight new URLs to the BlueBird worker and four to comparisons under the approved global maximum twelve. A BlueBird batched navigation gathered nine; the comparison worker had already gathered four before the parent attempted reallocation. Actual total: thirteen unique new public source URLs, including failed PDF attempts.
-
This is a process error and scope-bound nonconformance, not an approved expansion. Historical gathered evidence is preserved; no retrospective approval is claimed. Parent stopped all further external gathering and immediately notified the human and manager. Synthesis/review is limited to already captured material; no further external research is authorized here.
-
Manager ruling: original synthesis and independent review may continue using already preserved material only. All additional external retrieval, including retries, is prohibited under this authorization. Resource nonconformance remains open for disclosure in completion; further gathering requires an amended scope and both gates.
2026-10-09 — original deliverables complete with resource nonconformance
- Completed summary, matrix, co-founder detail, comparison detail, gap register/unsent request, consolidated accounting and worker manifests; four canonical company profiles updated without duplicating identities.
- Independent Sol review found no material correctness defects and separately flagged failed resource compliance. No second pass needed.
- Actual phase preservation: 17 capture records (14 successful partial text captures, 3 failures) across 13 new URLs plus one supplemental reused-category capture; reused RES-001 originals retained. Scope v002 bytes/hash unchanged. Parent knowledge validation and isolated index rebuild/validation passed; final count is reported at handoff.
- Brief set complete for original deliverables, explicitly with source-bound nonconformance (13 versus 12). No further gathering/outreach/implementation is authorized. Proposed dispatch/count-ledger prevention goes to manager/Astra, without any harness change here.
- Exact owned paths and stable completion checkpoint handed to manager; writes freeze until commit confirmation.